Better homes start with better building systems.

HiPer Haus designs, installs and commissions MVHR ventilation systems, carries out blower door airtightness testing, and supplies CO₂ heat pump hot water for high-performance and Passive House homes across South Australia.

Certified Passive House Tradesperson
South Australian specialist
MVHR design, installation & commissioning
Blower door testing & diagnostics
Building Science

The building systems inside your home matter as much as the structure.

A well-insulated, airtight home needs controlled ventilation — without it, moisture, CO₂ and pollutants accumulate. The right systems, properly designed and commissioned, transform a good building into a home that is genuinely healthy and comfortable to live in.

  • Indoor air qualityContinuous, filtered fresh air in every room. No stale zones, no humidity spikes — just a consistent, healthy indoor environment year-round.
  • Thermal comfortStable temperatures without cold spots or draughts. Proper ventilation and airtightness eliminate the discomfort that insulation alone can't fix.
  • Energy efficiencyMVHR recovers up to 90% of heat from outgoing air. Heat pump hot water uses a fraction of a conventional element. Both reduce ongoing running costs significantly.
  • Moisture & condensation controlBalanced ventilation keeps relative humidity in check, protecting the building fabric and reducing the risk of mould, condensation and long-term structural damage.
  • Long-term building performanceSystems that are properly designed, installed and commissioned perform reliably for decades — not just on paper at handover.
MVHR ductwork installation in a high-performance home — Adelaide
Certified Passivhaus Plus — Enduro Builders, South Australia
Passive House & High-Performance

Designed for demanding projects.

Whether you’re targeting Passive House certification, an architect-designed high-performance home, or a retrofit to reduce energy use — we understand what these projects actually require. We’re engaged from design stage, not called in at the end.

  • Passive House MVHR design and certification support
  • Airtightness strategy from early design stage
  • Blower door testing at mid-construction and final
  • MVHR ductwork coordination with your builder
  • Full commissioning, balancing and documentation
Support for builders & designers
Recent Work

Projects we’re proud of.

View all projects
High Performance Home — Wynn Vale
New Build

High Performance Home — Wynn Vale

MVHR Design & InstallationHeat Pump Hot WaterCommissioning

Working with Enduro Builders, we installed a Zehnder ComfoAir Q350 MVHR system with ComfoTube ducting run within a Pro Clima Intello airtight dropped ceiling — keeping all ductwork inside the thermal envelope. We also supplied and installed a Reclaim Energy CO₂ heat pump hot water system.

Zehnder Q350 MVHR commissioned and balanced. Reclaim Energy CO₂ heat pump supplied and installed.

High Performance Home — Middleton
New Build

High Performance Home — Middleton

MVHR Design & InstallationHigh Performance Build

A high-performance home on the Fleurieu Peninsula built by 35 Degrees South in 2025. HiPer Haus designed and installed the Sabik MVHR system to deliver controlled fresh air ventilation throughout the home.

Sabik MVHR unit designed, supplied and commissioned. Built by 35 Degrees South, 2025.

Passivhaus — Theberton
New Build

Passivhaus — Theberton

Passive HouseMVHR Design & InstallationHeat Pump Hot Water

A Certified Passivhaus built by Enduro Builders in 2025. HiPer Haus supplied and commissioned the Zehnder ComfoAir Q350 MVHR system and Reclaim Energy CO₂ heat pump hot water system with 315L tank.

Zehnder ComfoAir Q350 MVHR and Reclaim Energy CO₂ heat pump with 315L tank supplied and commissioned.

Passivhaus Plus Display Home — Mount Barker
New Build

Passivhaus Plus Display Home — Mount Barker

Passive House PlusMVHR Design & InstallationHeat Pump Hot Water

Designed and built by Enduro Builders to demonstrate that a Certified Passivhaus can be achieved in Australia using locally available materials — without importing windows. Opened to the public as a display home. HiPer Haus supplied and commissioned the MVHR and CO₂ heat pump systems.

Certified Passivhaus Plus. Zehnder ComfoAir Q350 and Reclaim Energy 315L CO₂ heat pump supplied and commissioned.

Ready to build a healthier, more efficient home?

Talk to us early — at design stage if possible. The sooner we’re involved, the better the outcome for your project.

Adelaide · Adelaide Hills · Fleurieu Peninsula · Barossa Valley · wider South Australia